NEFCO supports energy efficiency investment in Ukrainian steel sector

Intro-text for frontpage: 

The NEFCO managed Baltic Sea Region Testing Ground Facility (TGF) has procured emission reduction units from an industrial energy efficiency project in eastern Ukraine under the Joint Implementation mechanism of the Kyoto Protocol.

The TGF buys carbon credits on behalf of its investors, thus helping governments and companies to meet greenhouse gas emission reduction targets under the Kyoto Protocol and the EU Emissions Trading Scheme.

Picture in intro-text: 

The carbon project in Alchevsk, Ukraine is expected to reduce emissions of carbon dioxide by some 1.1 million tonnes.

The carbon project in Alchevsk, Ukraine is expected to reduce emissions of carbon dioxide by some 1.1 million tonnes.

 

Body: 

The first Ukrainian TGF project reduces natural gas and electricity consumption through the recovery of waste heat in a coke plant in Alchevsk city, Luhansk region of eastern Ukraine. This is one of the largest industrial enterprises in the Donbass region.

The project consists of captive cogeneration with waste heat recovery at Alchevsk Coke Plant (OJSC Alchevskkoks) to displace the use of natural gas and (30 GWh p.a. of) grid electricity.  The project entails installation of a waste heat recovery system, a highly efficient boiler firing coke oven gas (COG) and blast furnace gas (BFG) and a 9 MW turbine generator connected to the boiler, generating up to 54 GWh p.a. of net electricity. In total, the project is expected to reduce carbon dioxide emissions by over 1.1 million tonnes of carbon dioxide equivalent during 2008-12. These will result in Emission Reduction Units (ERUs), which will be procured by the TGF.

The project has been developed as a JI project by the Japanese Sumitomo Corporation which also has extensive international experience in the deployment of the project technology.

“We are pleased to conclude our first major Joint Implementation project in Ukraine, working with Ukrainian and Japanese partners to introduce low emission energy generation technology into this important industrial sector”, stated Ash Sharma, Head of Carbon Finance and Funds at NEFCO.

The JI project has received a determination report from accredited entity Bureau Veritas Certification and Letter of Approvals from the Designated Focal Points of Japan (September 2009) and Ukraine (December 2009). The project is presented for final determination under the Ukrainian Track 1 of the JI mechanism.

Read our press release in English or Russian 

Read the project profile document

Read about the Nordic Investment Bank's investments in the Ukrainian steel industry

Learn more about carbon financing

Learn more about the Ukrainian steel sector


  • NeCF signed an emission reduction purchase agreement from a hydro power project in Vietnam last year.

    NeCF signed an emission reduction purchase agreement from a hydro power project in Vietnam last year.

    [10.3.2010]

    The Carbon Finance and Funds (CFF) operations of NEFCO expanded in both volume and scope in 2009, against a backdrop of difficult economic conditions globally and political uncertainty regarding international climate policy.

    The NEFCO Carbon Fund (NeCF), now with financial resources exceeding 100 million euro, has been active in sustainable energy investments in Asia and Africa. NEFCO's pioneering Baltic Sea Region Testing Ground Facility (TGF), a 35-million-euro regional carbon finance facility, concluded its active procurement and entered fund administration phase in 2009.

  • NEFCO's investments reduced electricity consumption by 5.5 million MWh last year. Photo: Patrik Rastenberger

    NEFCO's investments reduced electricity consumption by 5.5 million MWh last year. Photo: Patrik Rastenberger

     

    [4.3.2010]

    The Nordic Environment Finance Corporation’s financial accounts for 2009 show encouraging  environmental results. The corporation’s environmental status report indicates that, compared to 2008, the emission of environmentally harmful substances in projects co-financed by NEFCO decreased substantially.

    Overall, there were considerable reductions in emissions of carbon, sulphur and nitrogen oxides, phosphorus as well as nitrogen.

  • [4.3.2010]

    The Nordic Environment Finance Corporation’s financial accounts for 2009 show encouraging environmental results. The corporation’s environmental status report indicates that, compared to 2008, the emission of environmentally hazardous substances in projects co-financed by NEFCO decreased substantially. Overall, there were considerable reductions in emissions of carbon, sulphur and nitrogen oxides, phosphorus as well as nitrogen.

  • Irrigation of farmland. Droughts are expected to increase in the Southern hemisphere as a result of climate change.

    Irrigation of farmland. Droughts are expected to increase in the Southern hemisphere as a result of climate change.

    [26.2.2010]

    The Nordic Climate Facility, launched in autumn 2009, has attracted great interest. The response to the first call for proposals was larger than expected. A total of 138 applications were received, of which 33 projects have been shortlisted for full proposals.

    The facility supports technology and know-how exchange between the Nordic countries and low-income countries in the area of climate change.

  • The head office of OJSC Kiev Margarine in Ukraine. Photo: Thorhallur Thorsteinsson

    The head office of OJSC Kiev Margarine in Ukraine. Photo: Thorhallur Thorsteinsson

    [1.2.2010]

    NEFCO has granted a new loan worth EUR 350,000 for financing cleaner production technology at OJSC Kiev Margarine Factory in Ukraine.

    The loan, which will be disbursed from the corporation’s Facility for Cleaner Production, is intended to refurbish the factory’s production line for edible fats and oils and reduce energy consumption by some 60,000 kWh per year.

  • Economist Anda Zake at Jūrmalas Ūdens. Photo: Patrik Rastenberger

    Economist Anda Zake at Jūrmalas Ūdens. Photo: Patrik Rastenberger

    [29.1.2010]

    Jūrmala’s deserted streets are not at their most charming during winter. But in summer, this celebrated resort is transformed into something of Latvia’s own Riviera, its fine, sandy shoreline and shallow waters inviting beachgoers in for a swim. With its 55,000 inhabitants and wooden houses, the city is also a popular destination for those living in nearby Riga. The local train to Jūrmala only takes around 30 minutes.

    The new wastewater treatment plant in Sloka treats some 6,200 cubic metres daily. Photo: Patrik Rastenberger

    The new wastewater treatment plant in Sloka treats some 6,200 cubic metres daily. Photo: Patrik Rastenberger

    Monitoring the flow at Jūrmala. Photo: Patrik Rastenberger

    Monitoring the flow at Jūrmala. Photo: Patrik Rastenberger

    At work in Sloka, Jūrmala. Photo: Patrik Rastenberger

    At work in Sloka, Jūrmala. Photo: Patrik Rastenberger

    Measuring pollution. Photo: Patrik Rastenberger

    Measuring pollution. Photo: Patrik Rastenberger

    Expanding the sewerage network in Jūrmala. Photo: Patrik Rastenberger

    Expanding the sewerage network in Jūrmala. Photo: Patrik Rastenberger

    Cleaner water for the Baltic Sea. Photo: Patrik Rastenberger

    Cleaner water for the Baltic Sea. Photo: Patrik Rastenberger

    Exposing the financiers at Jūrmala. Photo: Patrik Rastenberger

    Exposing the financiers at Jūrmala. Photo: Patrik Rastenberger

    Janis Vicieps, Manager at the wastewater treatment plant in Sigulda. Photo: Patrik Rastenberger

    Janis Vicieps, Manager at the wastewater treatment plant in Sigulda. Photo: Patrik Rastenberger

    The plant in Sigulda treats some 1,800 cubic metres of wastewater daily. Photo: Patrik Rastenberger

    The plant in Sigulda treats some 1,800 cubic metres of wastewater daily. Photo: Patrik Rastenberger

    The Gauja river - a spawning ground for salmon. Photo: Patrik Rastenberger

    The Gauja river - a spawning ground for salmon. Photo: Patrik Rastenberger

  • Cleaner water for the Baltic Sea. Photo: Patrik Rastenberger

    Cleaner water for the Baltic Sea. Photo: Patrik Rastenberger

    [28.1.2010]

    Ahead of the Baltic Sea Action Summit, NEFCO and the Nordic Investment Bank (NIB), have committed to actively supporting interested parties in order to make Baltic Sea projects bankable.

    The objective is to develop and implement concrete, cost-efficient investments that lead to a reduction of pollution in the Baltic Sea.

  • Production of biscuits at Yarychiv Biscuit Factory in Lviv, Ukraine. Photo: Thorhallur Thorsteinsson

    Production of biscuits at Yarychiv Biscuit Factory in Lviv, Ukraine. Photo: Thorhallur Thorsteinsson

     

    [18.1.2010]

    NEFCO has approved a loan for cleaner production at the Yarychiv Biscuit Factory. The factory, which is situated near Lviv in western Ukraine, accounts for 2.1 per cent of the country’s total biscuit production. 

    The loan, which amounts to EUR 350,000, has been disbursed from NEFCO’s facility for cleaner production. The purpose of the loan is to replace the existing sugar biscuit production line, which uses 105 gas burners, with more energy efficient and environmentally sound equipment. 

  • [15.1.2010]

    The Nordic Environment Finance Corporation (NEFCO) managed Baltic Sea Region Testing Ground Facility (TGF) has procured emission reduction units from an industrial energy efficiency project in eastern Ukraine under the Joint Implementation mechanism of the Kyoto Protocol. The TGF buys carbon credits on behalf of its investors, thus helping governments and companies to meet greenhouse gas emission reduction targets under the Kyoto Protocol and the EU Emissions Trading Scheme.

  • Erecting a wind mill in Estonia. Photo: Nelja Energia

    Erecting a wind mill in Estonia. Photo: Nelja Energia

    [14.1.2010]

    Two NEFCO projects in Estonia and Lithuania have qualified as Joint Implementation (JI) projects under the Kyoto Protocol. A landfill gas-to-energy project in Lithuania reached final JI status under the UN-regulated international track (Track 2).

    As of January 2010, only sixteen projects worldwide have secured final JI status under Track 2, including three NEFCO projects. In addition, NEFCO’s wind farm project was the sixth JI project to achieve final JI status through Estonia’s national track (Track 1).