This project is about turn-key installation of one Individual Heat Substation (IHS) and indoor automation systems in a previously thermally modernised building of NVK school in Volochysk, in Western Ukraine.

Volochysk City Council hereinafter referred to as “the Employer”, intends to use part of the proceeds of a grant from Finland Ukraine Trust Fund (FUTF), managed by the Nordic Environment Finance Corporation (NEFCO) towards the cost of:

  • Design works
  • Supply of equipment and materials
  • Logistic
  • Construction and Installation works, incl.:
    • Dismantling works
    • Civil works
    • Installation of equipment for the new IHS with connecting to the existing heating system
    • Supply and installation on-line heat consumption monitoring system
    • Installation of new bimetal radiators with Thermostatic Radiator Valves in the amount of 304 units
    • Hydraulic balancing of the internal network
    • Modernisation of the stock tanks of the DHW system
    • Laying and connection engineering internal network (incl. DWS, water pipes, electrical network etc.) for the heat point room
    • Installation of the fire alarm and security alarm systems
    • Providing of the heating and ventilation for the heat point room
  • Tests, start-up and commissioning, balancing the heating system
  • Training with the development of maintenance and operating instructions